Fashion Week Show
9 January 2025 | Palais Brongniart, Paris
This show took place as part of Paris Fashion Week autumn-winter, bringing together the big names in fashion in an immersive setting. A setting where technique and precision are essential.
GL events Audiovisual & Power installed the LED wall, lit the catwalk and backstage areas and provided the sound system for the entire show.
© Marie-Laure Dutel / Neige Thebault / Bureau Betak / Bureau Future
Fashion Week Show
9 January 2025 | Palais Brongniart, Paris
This show took place as part of Paris Fashion Week autumn-winter, bringing together the big names in fashion in an immersive setting. A setting where technique and precision are essential.
GL events Audiovisual & Power installed the LED wall, lit the catwalk and backstage areas and provided the sound system for the entire show.

© Marie-Laure Dutel / Neige Thebault / Bureau Betak / Bureau Future

© Marie-Laure Dutel / Neige Thebault / Bureau Betak / Bureau Future
CUSTOMER NEEDS
- Installation of lighting solutions for the NEF and backstage areas
- Sound system for the entire fashion show
- Deployment of a 25x5m LED wall
OUR AUDIOVISUAL SOLUTIONS :
- Installation of lighting solutions for the NEF and backstage areas
GL events Audiovisual & Power provided high-quality technical lighting for the NEF and backstage areas, using more than 100 lighting devices, including Esprite Profile projectors from ROBE, LED Batterie from ASTERA, LED B-Panel from LUXIBEL and GLP JDC-1 LED projectors.
- Sound system for the entire fashion show
A high-quality sound system was used throughout the show, comprising 50 L-Acoustics KIVA II and A15 Focus loudspeakers and 16 L-Acoustics KS21 subwoofers.
- Deployment of a 25x5m LED wall
We took care of the complete installation of the catwalk backdrop with the deployment of a UNILUMIN UPAD IV LED wall, measuring 25x5m, made up of 550 LED modules and a SMODE 4x4K Ultimate media server, to provide an optimal experience for guests.
The LED wall installation was supported by a Truss & Layher structure, made up of over 100 beams and angles. 16 D8+ 320kg electric motors and 28 D8+ 750kg motors were used to ensure the lifting and stability of the installation. The whole structure was supported by a STACCO 500 technical grid, guaranteeing a safe and efficient installation for the LED wall.